Building Permit Fee Calculator, 2026

Enter the declared value of the construction works (from the general cost estimate, excluding TVA).

Legal strategies to pay less See the verified strategies for local taxes. How to optimize →

Residential buildings only: if the declared value is lower than the existing taxable value, the fee is calculated on the taxable value, not the declared one.

Permit fee
0lei
Rate applied0.5%
Calculation base0 lei
Estimate, not tax advice. The fee is the same nationwide — it doesn't vary by locality, unlike building tax, land tax, or vehicle tax. It doesn't include the separate fee for the urban-planning certificate (a small per-m² tariff, set locally) or the OAR stamp fee (0.05% of the works' value, paid to the Order of Architects).
Legal strategies to pay less See the verified strategies for local taxes. How to optimize →

Legal framework

Governed by the Cod Fiscal, Art. 474, para. 5-6. Unlike most local fees, the rate isn't set by the local council — it's fixed nationally: 0.5% for residential buildings and outbuildings, 1% for any other construction (commercial, industrial, agricultural).

The minimum floor for residential

For residential buildings, if the value declared in the permit application is lower than the building's existing taxable value (calculated under Art. 457), the fee must be calculated on the taxable value, not the declared one — an anti-underdeclaration measure.

Final regularization

The fee paid when the permit is issued is provisional, based on the declared value. Within 15 days of completing the works, you file a declaration with the actual value, and the city hall recalculates — if you spent more than you initially declared, you pay the difference.